TILING
Tile work that stays put
Backsplashes, showers, floors and fireplace surrounds for Seattle-area homes, set on a base built to stay solid.
Licensed, bonded, and insured.
Building since 2020
Free written estimates
From a kitchen backsplash to a full shower, we set tile all over Seattle, Bellevue, Mercer Island and Kirkland, with straight grout lines and cuts that land where they should.
Already picked out your tile? Send us what you bought and where it's going, and we'll make sure it's right for the spot before we quote it. Redoing the whole room? Take a look at Kitchens or Bathrooms.
What We Build
Big or small, every bathroom we take on has to stay dry and solid for years, not just look good the day we finish.
Full bathroom remodels
We'll plan the whole room at once and build it as one project, start to finish.
Showers and tub surrounds
Tiled showers and tub surrounds, plus tub-to-shower conversions if you're ready to lose the tub.
Vanities and storage
New vanities, medicine cabinets, linen storage and built-in shelves, so everything finally has a place.
Tile floors and walls
Floors and walls set flat and straight, then sealed so they're easy to keep clean.
Trim and finish carpentry
Doors, baseboards and wainscoting, the finishing touches that make the room feel done.
Water damage and rot repair
Soft floor by the toilet? We'll open it up, fix what's rotted and close it back in properly.
Redoing the kitchen too? See Kitchens.
Choose the Project That Fits Your Bathroom
Some bathrooms just need a new vanity and fresh tile. Others need everything down to the studs. Most land in one of these three.
01
Refresh
Keep the layout and swap out the finishes.
Vanity, mirror, storage, trim and floor tile.
Your shower's in good shape and the room just needs updating.
02
Tub-to-Shower Conversion
Trade the tub you never use for a walk-in shower.
We pull the tub and build a waterproofed shower with tile walls in its place.
You shower every day and take a bath once a year.
03
Full Remodel
Take it down to the studs and start fresh.
Layout, shower or tub, waterproofing, tile, vanity and trim.
There's water damage, a soft floor, or a layout that just doesn't work.
Seattle air stays damp for much of the year.
Every shower adds more steam on top of that, and grout isn't waterproof on its own. What's behind the tile decides how long your bathroom lasts.
So we spend real time on the parts behind the walls and under the floor.
Built For a Wet Climate.
01
Behind the shower tile, we put a waterproof layer over the backer board, so any water that gets through the grout has nowhere to go. Shower floors slope toward the drain so water doesn't sit.
02
Ventilation matters just as much. A fan that vents outside pulls the steam out of the room instead of leaving it in your walls and ceiling.
03
You won't see any of this once the tile's up. It's what keeps mold, soft spots and peeling paint from showing up a few years later.
$10,000 to $20,000
For a tiled tub-to-shower conversion in a typical bathroom.
Every quote is written out line by line before we start, so you know exactly what you're paying for.
What Affects the Price
Scope. Swapping a vanity, converting a tub and gutting the whole room are very different jobs.
Tile and fixtures. What you pick here usually makes the biggest difference in price.
Plumbing. Keeping the toilet, drain and shower valve where they are now keeps costs down.
What's behind the walls. Older bathrooms sometimes hide rot or old leaks. If we find something, we'll show you, explain the fix and give you a price before we go any further.
Permits
In Seattle, anything that touches a load-bearing wall or cuts down a room's ventilation needs a permit, no matter how small the job. Plumbing and electrical work can need permits of their own.
The rules change from city to city around the Sound, so we look up what applies at your address and take care of the paperwork before we start.
How Long It Takes
Before we start, you'll get a schedule based on the scope and any permits.
A refresh goes a lot faster than a full remodel. New showers also need time for the waterproofing and grout to cure before anyone uses them, and we'll tell you up front how long you'll be without the room.
Recent Work
Tell Us About The Project
The more you can tell us up front, the more useful the first conversation is. If you would rather just call, the number can be found below.
RATHER CALL?
HOURS
Monday to Friday
6 AM - 6 PM
Saturday–Sunday
7 AM – 5 PM
SHOP
Our Process
-
01
Tell Us About Your Project
Tell us what you are planning and send a few photos of the yard. We follow up to talk through the project and set a time to come out.
-
02
Schedule a Site Visit
We walk the property with you, review drainage, soil, access, and other site conditions, then discuss the best options for your project.
-
03
Review Your Estimate
You receive a detailed written estimate outlining the scope of work, recommended materials, and cost.
-
04
We Get To Work
Our crew coordinates the materials, permitting when required, construction, and cleanup while keeping you informed throughout the project.
-
05
Final Walkthrough
We review the completed work with you and address any final details before wrapping up the project.